IP65 15.6 18.5 21.5 23.8 27 32 43 55 Inch Interact Smart Board Capacitive Touchscreen Monitor for Commercial
Price varies depending on material, logo, quantity and customization requirements.
Introduction
| type | Capacitive | interface type | USB |
| series | For Business | warranty(year) | 1-Year |
| after-sales service | Onsite Training and Inspection, Free Spare Parts, Return and Replacement, Repair, Others | products status | New |
| aspect ratio | 16:9 | private mold | Yes |
| package | Yes | color | Black |
| Brightness | ≥300cd/m 2 | Resolution | 1920*1080P |
| Interface | VGA HD-MI USB WIFI Lan | Touch Screen | Capactive Multi Touch Screen |
| Material | Aluminum Case+Tempered Glass Panel | Installation | VESA Wall Mount /Desktop |
| Input | 110-240V AC 50/60Hz | Size | From 5 to 86 inches |
| Product name | PCAP touch screen monitor/all-in-one | Notes | This price is just 21.5 inch touch monitor |
We are a professional manufacturer and supplier, dedicated to maintaining consistent quality and establishing long-term partnerships with clients worldwide.
Our mission is to provide high-quality products and reliable service. We are committed to offering the following advantages:
- Stable production system ensuring consistent quality, dependable supply, and standardized manufacturing management;
- Strict quality control covering material selection, processing, surface finishing, and final packaging;
- Variety of products and specifications to meet diverse project requirements and application scenarios;
- OEM & customization support based on drawings, samples, or specific technical requirements;
- Flexible packaging solutions to ensure safe handling and transportation of products;
- Continuous improvement in products and services to better support customers in different markets.
If you are interested in our products, please feel free to contact us. We look forward to establishing long-term and mutually beneficial cooperation with you.