Smart Display Screens

Smart Display Screens for retail and transport projects, with experienced, quality-checked production, OEM/ODM customization and steady supply. Quote now.

P5 LED Display Module 320*160mm Indoor Outdoor Advertising Screen IP65

$4.20-7.30 /pieces

Price varies depending on material, logo, quantity and customization requirements.

MOQ 2 pieces
Model NO. SC-20350
Service OEM / ODM
Quality You Can Trust
Flexible & Scalable Solutions
Customizable Product Options
Comprehensive Specifications
Your Reliable Business Partner

Introduction

applicationIndoor, OutdoorBrightness5500
WaterproofIP65Refresh Rate3840
Resolution64*32HDR SupportNo HDR
Viewing Angle160°, 170°, 180°Color Depth16-Bit
Color GamutRGBColor Temperature6500 K
Contrast Ratio5000:1Operating Temperature-20℃~60℃
Power Consumption150W/㎡Remote Device ManagementNo
Content Management SystemnovaMounting optionsWall Mount, Frontservice
typeLEDPower Supply100-240V AC
colorfull colorSunlight ReadableYes
media availablePhoto, Video, TextUsage environmentCommercial, Outdoor, interior
pixel density62500

We are a professional manufacturer and supplier, dedicated to maintaining consistent quality and establishing long-term partnerships with clients worldwide.

Our mission is to provide high-quality products and reliable service. We are committed to offering the following advantages:

  • Stable production system ensuring consistent quality, dependable supply, and standardized manufacturing management;
  • Strict quality control covering material selection, processing, surface finishing, and final packaging;
  • Variety of products and specifications to meet diverse project requirements and application scenarios;
  • OEM & customization support based on drawings, samples, or specific technical requirements;
  • Flexible packaging solutions to ensure safe handling and transportation of products;
  • Continuous improvement in products and services to better support customers in different markets.

If you are interested in our products, please feel free to contact us. We look forward to establishing long-term and mutually beneficial cooperation with you.

Copyright © 2026 China Loong Smart Electronics Co., Ltd. All rights reserved.
Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

P5 LED Display Module 320*160mm Indoor Outdoor Advertising Screen IP65

SKU: SC-20350

Contact Form (#3)

Home

Products

About

Contact