Smart Thermostats

Smart Thermostats for HVAC projects, offering OEM/ODM customization, quality-controlled production, and stable supply for distributors and contractors.

Wall Mounted Touch Screen OLED Smart Thermostat with WiFi Voice App Control Manual Heating and Cooling NTC Sensor

$11.80-18.30 /bag

Price varies depending on material, logo, quantity and customization requirements.

MOQ 1 bag
Model NO. SC-05522
Service OEM / ODM
Quality You Can Trust
Flexible & Scalable Solutions
Customizable Product Options
Comprehensive Specifications
Your Reliable Business Partner
Category: Smart Thermostats

Introduction

app-controlledYesVoltage220-240V
power sourceBatteryMaterialABC+pc V0
applicationCommercial, Hotel, Homeafter-sales service providedReturn and Replacement
FeatureApp Remote Control, Voice Control, Wifiprivate moldYes
packaging typesColor BoxProduct nameWall Mounted Touch Screen
TypeEASTIVoltage Input90V-240V AC
Timing FunctionSupport 6 different temperature periods per dayTemperature Accuracy+1°C
Temperature SensorNTC ThermistorSupported Heating TypesWater heating /Gas boiler / Wall-hung boiler/Electric floor heating
Display TypeLED Digital Display

We are a professional manufacturer and supplier, dedicated to maintaining consistent quality and establishing long-term partnerships with clients worldwide.

Our mission is to provide high-quality products and reliable service. We are committed to offering the following advantages:

  • Stable production system ensuring consistent quality, dependable supply, and standardized manufacturing management;
  • Strict quality control covering material selection, processing, surface finishing, and final packaging;
  • Variety of products and specifications to meet diverse project requirements and application scenarios;
  • OEM & customization support based on drawings, samples, or specific technical requirements;
  • Flexible packaging solutions to ensure safe handling and transportation of products;
  • Continuous improvement in products and services to better support customers in different markets.

If you are interested in our products, please feel free to contact us. We look forward to establishing long-term and mutually beneficial cooperation with you.

Copyright © 2026 China Loong Smart Electronics Co., Ltd. All rights reserved.
Leave A Message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.

Wall Mounted Touch Screen OLED Smart Thermostat with WiFi Voice App Control Manual Heating and Cooling NTC Sensor

SKU: SC-05522

Contact Form (#3)

Home

Products

About

Contact